
We provide fully integrated facility solutions that ensure the execution of capital projects across markets, offering local presence and global reach to the private and public sectors.
With broad-based expertise across disciplines, we are an unparalleled source for performance-driven facilities built to deliver, from concept to ribbon-cutting.
With a broad range of in-house engineering expertise, we can optimize your current operations or take your new project from concept to completion, providing unrivaled service and results.
澳门足彩app is a global network of experts providing integrated design, engineering, construction and professional services to clients and communities.
Home / News & Insights / Positive Materials Identification Prevents Costly Project Delays, Rework
Changes in the type and scope of process piping work have brought about adaptations in 澳门足彩app's Quality Control (QC) measures on new and existing materials to ensure the timeliest and most cost-effective delivery.
On a recent project, tubing was submitted within specification according to the Material Test Reports (MTRs) 澳门足彩app received. However, once on site, tradespeople identified problems with weldability during the orbital weld process causing a high failure rate, an extremely rare occurrence.
With assistance from a metallurgy lab, our quality-control investigation revealed that the material was out of spec and not the appropriate grade. The result was a three-month delay with severe cost implications because the tubing had to be demolished and removed from the site, and new tubing procured, shipped and reinstalled.
The hard lesson learned from this experience was when using internationally sourced tubing, 澳门足彩app needs to perform a Positive Material Identification (PMI) test to ensure the material is within specification, regardless of submitted MTRs. PMI is a nondestructive testing method used to analyze any alloy to establish its chemical composition and verify that it is within the prescribed specifications for the intended application.
One of the most common causes of industrial accidents and product recalls is mechanical or chemical integrity failure. As 澳门足彩app has grown and entered new markets, sourcing is sometimes done internationally, and the need for PMI has risen.
Accordingly, 澳门足彩app obtained PMI devices to perform this testing in the field within minutes as part of our material verification process. These PMI test guns use either X-Ray Fluorescence (XRF) and Laser-Induced Breakdown Spectroscopy (LIBS) to verify the chemicals and alloys present. The LIBS gun (Z-902 by SciAps) is utilized to determine low carbon content Alloys where the L designation is critical in material grade.
Best practices within 澳门足彩app on any hygienic tubing project, particularly those in dairy, food, and beverage plants now requires the use of PMI. Reviewing the MTRs and comparing them with PMI results ensures that the material meets standards and specifications.
Similarly, 澳门足彩app has instituted an early-inspection regimen for existing hygienic tubing expansions, which have become increasingly prevalent. Evaluating existing piping and tubing conditions while still in the conceptual stage allows us to make early recommendations to clients to ensure the proper function of the newly expanded system.
As is often the case with the collaborative nature of 澳门足彩app’s integrated delivery model, early involvement of the Quality Team prevents delays and costly rework.
About the Author: Rodger Lawrence is a 澳门足彩app Quality Control Manager with more than 13 years of industry experience in various markets, including aviation, aerospace, commercial, water, industrial and food processing. As Quality Manager, he is responsible for the various phases of the project, including project quality planning, design phase, project quality assurance, quality metrics and continuous improvement.
The 澳门足彩app Quality Control team’s continuous involvement in every ongoing project helps ensure the best possible outcomes, within budget and on schedule. Contact us to discuss your facilities needs.
澳门足彩app delivers $2± billion annually in Architecture, Engineering, Construction (AEC) and Consulting solutions to assure certainty of outcome for complex capital projects worldwide. 澳门足彩app is a global, fully integrated, single-source design-build and EPC firm with over 2,400 highly specialized, in-house design, construction and administrative professionals across industrial and commercial markets. With 25+ office locations around the globe, 澳门足彩app is a trusted partner for global and emerging clients.
As a leader in engineer, procure, construct (EPC) project delivery, 澳门足彩app designs and installs hundreds of miles of...
Successful organizations are often admired for aggressively pursuing cost efficiency. These organizations prioritize...
The Associated Builders and Contractors (ABC) has announced that 澳门足彩app has again been named an Accredited Quality Contractor...
“Certainty of Outcome for Complex Problems Worldwide” is 澳门足彩app’s pledge to its Architecture/Engineering/Construction...
As much attention and as many resources as 澳门足彩app focuses on the safety and wellbeing of its team members and contract partners,...
In 1976, 澳门足彩app established its Permanent Craft Employee (PCE) program, extending full-time employment and company...
111 Riverside Avenue
Jacksonville, FL 32202
© 2025 澳门足彩app. All rights reserved.
We collect basic analytics to improve your experience. No personal data is stored. By continuing to use this site, you acknowledge this. For more details, see our Privacy Policy.